Heljan 39ww

Class 02/2 Tango 2-8-0 in LNER livery

Manufacturer catalogue image - please note that pre-release images may be CAD renders or CGI/AI images rather than photographs

Prototype Era
Era 3 (1923 to 1947) The Big Four (LNER, LMS, GWR and SR)

Manufacturer description

Catalogue listing

Brand
Heljan
Product Code
39ww
RRP
£184.95
Release date
TBA

Model details

DCC status
DCC Ready 21-pin socket
Livery
LNER black
Gauge
OO
Minimum radius curve
Radius 2
Power pickup
Locomotive only
Coupling
NEM / Tension lock
Tooling date
2016
Coupling type
Tension lock
Minimum radius
Radius 2
Coupling mount
NEM pockets
Chassis construction
Plastic & metal
Scale
OO Gauge (1:76 Scale)

Prototype information

In service until
1963
Operated by
Great Northern Railway
LNER
British Railways
Main duties
Freight
Wheel configuration
2-8-0
Tractive effort
36,740 lbf
Builder
Doncaster Works
North British Locomotive Co.
Build date
1918 - 1943
Total built
67
Locomotive class*
Class O2 Tango Gresley GNR/LNER
Wheel arrangement
2-8-0
Built
1918 - 1943
Built by
Doncaster Works North British Locomotive Co.

* Class names often change over the lifespan of a locomotive, so this is not necessarily the class name used by the operator in the period modelled.

Supplier Links

Heljan website


Search on Amazon


Search on eBay

Supplier links are provided for your convenience and do not guarantee that the product is currently available. RailwayModels.uk is not a representative of these suppliers, but may receive a commission when purchases are made through links on this page.

Related products

The Heljan Class 02/2 Tango 2-8-0 is an OO gauge model (1:76 scale) representing a London and North Eastern Railway freight locomotive from the era of the Big Four. It is supplied in LNER black livery and depicts a locomotive built between 1918 and 1943 at Doncaster Works and the North British Locomotive Co.

The model features a plastic and metal chassis, tension‑lock couplings fitted in NEM pockets, and can negotiate a minimum radius of 2. It carries the manufacturer part number 39ww. The prototype had a tractive effort of 36,740 lbf, a 2-8-0 wheel arrangement and was in service until 1963, performing freight duties for the Great Northern Railway, LNER and British Railways.

RailwayModels.uk is a Good Stuff website.

Page generated in 3.97 seconds
216.73.217.122
Mon, 13 Jul 2026 01:40:54 +0100
Multimedia Misadventurism