Published on Thursday 28 August 2025 by PECO TV
Part 2 of the 4 part series will be looking at wiring and connecting the point motor to the PL-35 CDU, plus installation of passing contact switches and accessory switch housing.
In Part 3 we will be looking at using micro switches and frog polarity switching.
The video description and textual content is provided by the publisher of the video, and may contain external links. RailwayModels.uk has no connection with the sites linked to, and links are not checked before the video is published here.