Manufacturer catalogue image - please note that pre-release images may be CAD renders or CGI images rather than photographs
Prototype Era
Era 10 (2005 to 2015) Rebuilding of the Railways
Expected Delivery Q3 2025 (Subject to change at Manufacturer's Discretion).
Previous versions pictured, will be updated at a later date.
The MRA side tipping ballast wagon ran in fixed rakes of five wagons, one of which was fitted with a generator to provide power and air for the whole set. Each wagon had two shallow boxes which could be tipped to either side, discharging ballast onto parallel track beds. The first batch of 300 wagons (60 sets) was made by Thrall Europa in York between 2000 and 2002 and was liveried in cream and blue of Railtrack. A second batch of 100 wagons (20 sets) was made by Trinity Rail in Romania in 2004 and brand in yellow Engineers livery of Network Rail. in 2006 five sets were transferred to GB Railfreight to work on its Metronet track removal contract. From 2023 a program to convert a significant portion of the MRA fleet into JNA-Y wagons has been undertaken.
Supplier links are provided for your convenience and do not guarantee that the product is currently available. RailwayModels.uk is not a representative of these suppliers, but may receive a commission when purchases are made through links on this page.