Hornby R30389

BR - Stanier 5MT Black 5 - 44748 'Late Caprotti'

Manufacturer catalogue image - please note that pre-release images may be CAD renders or CGI images rather than photographs

Prototype Era
Era 5 (1957 to 1966) British Railways Late Crest

Manufacturer description

Although the LMS ‘Black Five’ was a huge success, Stanier’s successor George Ivatt made a number of experimental modifications which resulted in some unusual variants from 1947 onward. No. 44748 was the first of a batch of 20 built with Caprotti valve gear at Crewe Works. Under this arrangement, the locomotive’s valve gear was driven by a single shaft between the frames, connected to the locomotive’s leading axle with a bevel gear. The modifications resulted in an unusual appearance, with bulbous steam pipes, lower running plates with wheel splashers and a modified cab. 

Less obvious was a larger wheel spacing between the centre and rear driving wheels. New to Longsight shed, Manchester in February 1948, this locomotive carried the temporary identification M4748 before being allocated its BR number 44748. Other than a brief spell at Derby shed, it remained a Longsight engine and was withdrawn from there in September 1964 and scrapped by the end of the year.

Catalogue listing

Brand
Hornby
Range
2025 Range
Product Code
R30389
GTIN
5063129044374
RRP
£249.99
Catalogue
2025 Range

Model details

DCC status
DCC Ready 21 pin socket
Finish
Painted
Gauge
OO
Motor
5 Pole Skew wound
Livery
BR Black
Colour
Black
Minimum radius curve
2nd Radius (438mm)
Buffers
Sprung Metal Buffers
Coupling
NEM / Tension Lock

Prototype information

Operator
BR
Designer
Stanier

Buy now from Hornby

Search on Amazon

Search on eBay

Supplier links are provided for your convenience and do not guarantee that the product is currently available. RailwayModels.uk is not a representative of these suppliers, but may receive a commission when purchases are made through links on this page.

RailwayModels.uk is a Good Stuff website.