Manufacturer catalogue image - please note that pre-release images may be CAD renders or CGI images rather than photographs
Prototype Era
Era 3 (1923 to 1947) The Big Four (LNER, LMS, GWR and SR)
Having completed nearly 90,000 miles of test running since new, Sir Nigel Gresley’s W1 4-6-4HP No. 10000 entered Darlington Works on 21 August 1935 for what was anticipated to be a major overhaul and modification. During this period, Gresley decided that it was time to rebuild 10000 as a three-cylinder locomotive with a conventional firetube boiler, and 10000 was moved to Doncaster Works on 13 October 1936 with the first drawing for the modification being prepared at the end of November.
When 10000 was finally released from Doncaster Works in November 1937, it was a significantly different locomotive; being fitted with a diagram 111 boiler that was very similar to the diagram 108 boiler fitted to No. 2006 ‘Wolf of Badenoch’, and with a streamlined casing to the same pattern as the A4 class. As many components as possible from the original W1 were used in the rebuild, including the frames, which were shortened by 1½ feet at the front end. Other items, where needed, were sourced from the A4 class, the A3 class or, like the front bogie, from the B17 and an experimental double Kylchap blastpipe and chimney was fitted.
The cab, while similar to that of the A4 class, was considerably longer and this led to the retained original tender’s coal delivery chute having to be lengthened to compensate for the extra distance from the firebox doors. The original tender was retained, but with superficial modifications, such as to the curvature of the front plates and the addition of streamlined plating to the front and rear, although this was partially removed just a year later, in 1938.
Up to the outbreak of war in 1939, and during the war years, 10000 worked mainly on Kings Cross main line duties and with its power and smooth riding it was a popular engine with the LNER’s drivers, though less so with the firemen due to the distance between the shovelling plate and the firehole door. The locomotive also became more ‘fitter’ friendly after April 1942 when the skirting was removed from ahead and behind the outside cylinders to improve access in wartime conditions.
The Class W1 No. 10000 ‘Hush Hush’ is the next model to be treated to a steam generator. Adding to the rise of modern locomotive innovation, this model is installed with a steam generator, which provides the ability to produce great clouds of water vapour which will billow through the locomotive’s chimney. Bring life and realism to your layout with this terrific model.
* Class names often change over the lifespan of a locomotive, so this is not necessarily the class name used by the operator in the period modelled.
Supplier links are provided for your convenience and do not guarantee that the product is currently available. RailwayModels.uk is not a representative of these suppliers, but may receive a commission when purchases are made through links on this page.